This Mech Power Engineering project covers supply, installation, testing and commissioning for Network Clothing Ltd..
The project is located at Chandona, Gazipur. The scope includes a specified rating or quantity of 1,250 kVA and 4,000 kVA. This assignment forms part of MPE’s industrial substations portfolio, addressing the electrical or operational requirements identified for the client.
The substation provides an interface between the incoming electricity supply and the facility’s distribution system. Its role is to serve site loads through appropriately rated transformation and