What we do
Existing equipment should be assessed in the context of its duty, condition and operating history. A recurring trip, damaged component, changed load or planned expansion may call for different work. We review the reported issue and available information before defining the inspection or servicing requirements.
Our re-engineering work can include panel servicing, switchgear inspection and repair, transformer-related servicing and refurbishment or modification of agreed equipment. Proposed replacements and changes are reviewed against the existing arrangement, available ratings and installation interfaces rather than treated as direct substitutions without checks.
How MPE can support your project
- Review the reported issue, operating history and available equipment information.
- Inspect the agreed equipment and identify the servicing or repair work required.
- Coordinate specified component replacement, panel repairs or wiring modifications.
- Review refurbishment or upgrade requirements against the existing system interfaces.
- Carry out the agreed checks and prepare service or handover information for the completed work.
From requirements to agreed deliverables
Assess the equipment
Share the symptoms, nameplate details, photographs, previous service records and any available drawings. The inspection scope and access requirements are agreed with the site team.
Agree the work plan
Findings are reviewed before the repair, servicing or modification scope is confirmed. Proposed components, interfaces and shutdown requirements are identified for approval.
Complete and check
The agreed work is carried out and the specified checks are coordinated before return to service. Completed work, observations and any further recommendations are recorded as required.
Information to share with us
Send what you already have. Our team can identify the remaining information needed to review a suitable scope and prepare a proposal.
- Equipment type, nameplate details and clear photographs
- Description of the issue and relevant operating history
- Available drawings and previous inspection or test records
- Current loads, proposed changes and site conditions
- Access, shutdown window and required completion date
Related equipment & solutions
Common questions
Can you inspect equipment before quoting a repair?
Yes. An inspection or assessment can be discussed where the available information is not sufficient to define the repair. Any inspection visit and its deliverables are agreed separately or included explicitly in the proposal.
Can old components be replaced with a different make?
A replacement requires a review of ratings, fit, connections, protection and control interfaces. Any proposed alternative is identified for technical review rather than assumed to be interchangeable.
Discuss your requirements with MPE
The proposal defines the equipment, work, documentation and responsibilities included for your project.
Request a quotation