What we do
A practical electrical design begins with understanding how the facility operates. The incoming supply, connected equipment, starting loads, operating hours and future expansion all influence the proposed arrangement. We review the available information with your team before developing the agreed engineering scope.
Our work brings the main parts of the system together: transformers, switchgear, distribution panels, protection, cables, busbar routes, earthing and solar equipment where required. The aim is a coordinated set of requirements that procurement, manufacturing and site teams can work from.
How MPE can support your project
- Review the load schedule, incoming supply and existing installation information.
- Select equipment arrangements against the agreed project duty and technical requirements.
- Prepare or coordinate single-line diagrams, equipment layouts and panel-related drawings.
- Review cable, busbar, earthing and installation interfaces within the agreed scope.
- Coordinate drawing comments, equipment schedules and revisions before procurement or installation.
From requirements to agreed deliverables
Understand the requirement
Share the site information, load schedule, available drawings and intended use. We identify the project boundaries, existing constraints and information that needs confirmation.
Develop the arrangement
We coordinate the proposed system, equipment requirements and drawing interfaces. Changes are reviewed with the relevant client, manufacturer and site representatives.
Prepare for execution
The agreed drawings and technical schedules become the basis for the quoted supply or installation scope. Revisions and outstanding interfaces are identified before work proceeds.
Information to share with us
Send what you already have. Our team can identify the remaining information needed to review a suitable scope and prepare a proposal.
- Existing single-line diagram and available layout drawings
- Connected loads, demand information and expansion plans
- Incoming voltage, supply arrangement and site location
- Specified equipment makes or approved technical requirements
- Required engineering deliverables and project programme
Related equipment & solutions
Common questions
Can you review an existing installation?
Yes. Send the available drawings, equipment details and the changes you are considering. The review scope can then be agreed around the information available and any site inspection needed.
Does the engineering scope include equipment supply?
Engineering, equipment supply and installation can be discussed together or separately. The quotation identifies the deliverables and responsibilities included for your project.
Discuss your requirements with MPE
The proposal defines the equipment, work, documentation and responsibilities included for your project.
Request a quotation