What we do
Substation work needs careful coordination between the electrical arrangement and the conditions on site. Equipment positions, cable approaches, foundations, earthing connections, access and operating arrangements all affect how the installation is planned.
We support new and upgraded substation infrastructure, including bay-extension works and associated electrical installations. For work within an operating facility, the available shutdown windows, client requirements and interfaces with the relevant operating team are reviewed before the execution scope is agreed.
How MPE can support your project
- Review the approved layout, equipment schedule and substation work boundaries.
- Coordinate the specified transformer, switchgear and associated equipment installation.
- Carry out the agreed power-cable laying, termination and connection works.
- Coordinate earthing, equipment supports and related site interfaces within the order scope.
- Support the specified inspections, testing, commissioning and handover activities.
From requirements to agreed deliverables
Review the site interfaces
We examine the available drawings, equipment positions, access and connection points. Existing installations, operating restrictions and work boundaries are identified with the client team.
Plan and execute the works
Activities are coordinated around equipment delivery, civil readiness and the approved operating arrangements. Changes affecting other systems are reviewed before the affected work proceeds.
Verify and close out
The agreed checks, tests and commissioning activities are coordinated. Drawings, test information and outstanding items are reviewed for the project handover.
Information to share with us
Send what you already have. Our team can identify the remaining information needed to review a suitable scope and prepare a proposal.
- Substation location, voltage levels and available layout
- Equipment schedule and approved technical drawings
- Details of the existing installation and connection points
- Site access, civil interfaces and shutdown constraints
- Inspection, testing and documentation requirements
Related equipment & solutions
Common questions
Can you carry out upgrades in an operating facility?
An upgrade can be reviewed around the existing installation and operating constraints. The work sequence, isolation or shutdown arrangements and relevant responsibilities must be agreed for that site.
Do you support bay-extension and earthing works?
Yes. Share the approved requirements, drawings and site details so MPE can review the electrical works and associated interfaces to be included in the proposal.
Discuss your requirements with MPE
The proposal defines the equipment, work, documentation and responsibilities included for your project.
Request a quotation