Net Metering in Bangladesh

বাংলাদেশে নেট মিটারিং

Net metering connects an eligible renewable-energy installation to the utility network and provides an approved method for recording imports, exports and applicable credits. MPE can help prepare the technical scope; approval remains with the utility.

Net Metering in Bangladesh — illustrative solar installation
Illustrative solar scene. Equipment and layout depend on the project.

Check the current framework

Use the Net Metering Guidelines 2025 and current utility instructions. The ordinary inverter AC-capacity limit is linked to the sanctioned load; exceptional arrangements require the prescribed review. Panel kWp and inverter kW are different quantities. Connection type, site and equipment compliance still need assessment.

Understand the application sequence

Start with consumer details and an installation proposal. The utility reviews the application and site before permission to install. After installation, the system is evaluated and the applicable agreement and metering arrangements are completed. Do not treat an estimate or a submitted application as permission to export.

Prepare the technical package

Bring recent bills, sanctioned-load details, connection information, site layout, proposed capacity and equipment data. Confirm the required metering, protection and documentation with the utility. Module and inverter eligibility should be checked using the official approved-equipment resources.

Keep export credits separate from bill savings

Electricity used directly on site can reduce purchased energy. Exported energy is accounted for under the applicable rules, including the relevant adjustments and settlement process. Demand charges, meter charges and taxes can remain. This website calculator does not reproduce utility billing or promise a cash payment.

CAPEX and OPEX are different commercial choices

An owner-funded project and a third-party investment arrangement have different contracts and responsibilities. Review roof access, equipment ownership, maintenance, insurance and commercial terms before committing. Any offered financing or energy-sale arrangement needs its own quotation and agreement.

Have your bill and roof details ready?

Use the calculator for a first estimate, or continue the solar conversation with our team.

Bangladesh planning references · reviewed 24 October 2026

Final design, eligibility, costs, equipment warranty and availability are confirmed for each project. Consult current utility instructions before applying.